A concrete screed machine in Pakistan costs about PKR 110,000 to 260,000 in 2026 for a petrol vibrating screed with a 2 to 4 metre blade. It levels and vibrates the top 75 to 100 mm of a fresh slab in one pass, and two operators can cover 80 to 150 square metres an hour.
Our catalogue calls it a "screed screener machine", and on site you will hear "power screed", "vibrating screed" or just "the screed". They mean the same machine: a long aluminium blade with a small petrol engine in the middle that shakes the blade as it is pulled across the wet concrete. This guide covers what it costs, which blade length to buy, what flatness to expect, and whether it is worth it against two labourers and a straight edge.
How much does a concrete screed machine cost in Pakistan?
| Type | Blade length | Power | Indicative 2026 market price (PKR) | Typical use |
|---|---|---|---|---|
| Light vibrating screed | 1.5 to 3 m | Small petrol engine, about 1 to 1.5 hp | 110,000 to 180,000 | House slabs, ground floors, driveways |
| Standard vibrating screed | 3 to 5 m | Petrol, about 1.5 hp, or electric | 150,000 to 260,000 | Larger slabs, apartments, car parks |
| Long blade or extended | 5 to 6 m | Petrol | 220,000 to 380,000 | Warehouses, factory floors |
| Truss screed | 6 to 15 m | Petrol, larger engine | 600,000 and up | Industrial floors, airport aprons |
| Laser screed | Boom mounted | Diesel | Many millions | Large industrial floors only |
These are 2026 market ranges in Pakistan, not a Shahzad Brothers quote. Confirm today's price on WhatsApp, rates move with the exchange rate. Spare blades in different lengths are usually priced separately.
What does a screed machine do?
It does two jobs at once:
- Levels. The blade rides on forms, screed rails or the edge of the previous strip and strikes off the concrete to that level.
- Vibrates the surface. An eccentric weight in the engine housing shakes the blade, which compacts the top 75 to 100 mm, closes small surface voids and brings up a layer of paste for finishing.
The result is a flatter slab with a closed surface that is ready for the power trowel. It does not compact the full depth of a 150 mm slab or the beams under it. A poker vibrator does that first; see vibrator needle size.
Screed machine vs manual straight edge
| Point | Manual straight edge | Vibrating screed |
|---|---|---|
| Crew | 2 to 3 labourers | 1 to 2 operators |
| Output | 30 to 50 square metres an hour | 80 to 150 square metres an hour |
| Surface compaction | None, just levelling | Top 75 to 100 mm |
| Typical flatness over 3 m | 8 to 12 mm | 4 to 6 mm |
| Labour fatigue in summer | High | Moderate |
| Best for | Small patches, tight corners | Any slab over about 50 square metres |
The flatness figures are typical site results, not guarantees. They depend heavily on how well the forms or rails were set. A screed is only as level as what it rides on. If the rails are 10 mm out, the slab will be 10 mm out, perfectly flat.
Is it worth buying?
A contractor pouring two or three house slabs a month in Rawalpindi, Islamabad or Lahore usually recovers the cost within the first year in saved labour and less grinding and patching. A builder doing one slab a year is better off with a good aluminium straight edge.
Which blade length should you buy?
Choose a blade about 0.5 to 1 metre longer than the widest bay you pour, so it rests on both rails with room to spare.
- House slabs, poured in bays of 3 to 4 metres between beams or rails: a 4 or 5 metre blade.
- Driveways and paths, 2.5 to 3 metres wide: a 3 or 3.5 metre blade.
- Warehouse floors, in bays of 5 metres or more: a 6 metre blade, or a truss screed.
Many machines take interchangeable blades. Buying one engine unit with two blade lengths is cheaper than two machines.
Check the blade for straightness before you accept it: lay it on a flat floor and slide a 2 mm feeler or a coin under it along its length. If the coin passes anywhere, the blade is bowed and the slab will show it. Aluminium blades bend if they are carried by one end or left across a gap on the back of a pickup.
Slab levels in Pakistan: what to aim for
Most residential specifications in Pakistan ask for a slab top that is within a few millimetres of level over a 3 metre straight edge. Housing societies and consultants on DHA, Bahria and CDA projects check this when tiles are laid, because a slab that is out by 15 mm costs a lot of extra screed mortar under the tiles.
To get there:
- Set the levels with an instrument. Fix screed rails or level pads with an auto level, not a water tube. A good auto level reads to about 2 mm at 30 metres.
- Place and poker-vibrate first. Bring the concrete slightly above finished level.
- Screed in one steady pass. Keep a small roll of concrete in front of the blade along its full length. Where it runs out, a hollow forms.
- Fill hollows immediately, then make a second, lighter pass.
- Trowel later. Wait until the slab takes a footprint about 3 mm deep, then use a power trowel.
In summer, when slab temperatures pass 35 degrees, the window between screeding and stiffening is short. Pour early in the morning or at night; see tower light price in Pakistan for night pours. In the monsoon, keep polythene on site to cover a fresh slab if rain arrives.
What are the disadvantages of a screed machine?
It is honest to list them:
- It needs rails or forms. Without something firm and level to ride on, the blade follows the operator's arms and the slab follows the blade.
- It struggles with stiff mixes. Concrete with a slump below about 50 mm tears under the blade instead of flowing. Order a mix of 75 to 100 mm slump for screeded slabs.
- It does not reach corners and columns. Plan for a labourer with a hand float around every column, drain and edge.
- It cannot fix bad levels. If the rails are wrong, the machine reproduces the error faithfully.
- It does not compact depth. It works the top 75 to 100 mm, so the poker vibrator is still needed.
None of these is a reason not to buy one. They are reasons to plan the pour around it.
What breaks on a screed machine
- Engine air filter, choked by cement dust. Clean it daily.
- Blade clamps and bolts, which shake loose. Check them before each pour.
- Bent blades, from careless transport.
- Throttle cables, snapped where they are routed over the handle.
Wash the blade straight after use. Hardened concrete on the underside makes every later slab rough.
What we supply
- Concrete surface finishing screed machine
- Power trowel and the Norton Clipper CT901 power trowel for finishing
- Concrete poker vibrator and vibrator shafts for full-depth compaction
- All small construction machinery
Related reading: concrete vibrator price in Pakistan and concrete mixer machine price in Pakistan.
Ask for today's price
Tell us your typical bay width, slab thickness and how many square metres you pour a month. We will suggest a blade length and quote the machine with any spare blades. Send us a WhatsApp for today's price.
What we supply
Equipment covered in this guide

Power Trowel
Walk behind helicopter trowel for floating and finishing a slab. Petrol engine, adjustable blade pitch.

Concrete Surface Finishing Screed Machine
Vibrating screed with a blade in the lengths a slab pour needs. Levels and consolidates in one pass ahead of the trowel.

Concrete Poker Vibrator
Petrol drive unit with a flexible shaft and poker head, in the usual diameters. Spare shafts and heads held.
FAQ
Questions buyers ask us
What is the price of a concrete screed machine in Pakistan?
In 2026 a petrol vibrating screed with a 2 to 4 metre aluminium blade costs about PKR 110,000 to 260,000 at market rates, and longer or truss screeds more. Laser screeds run into many millions. Confirm today's price on WhatsApp, rates move with the exchange rate.
What does a screed machine do?
A vibrating screed strikes off fresh concrete to level while vibrating the top 75 to 100 mm, closing the surface and bringing paste up for finishing. It replaces two labourers pulling a straight edge and gives a flatter slab in about half the time.
What is the machine that smooths concrete called?
Two machines do the job in sequence. A screed machine levels the wet concrete within the first 30 minutes. A power trowel, often called a helicopter, then smooths and hardens the surface a few hours later, once the slab will carry a footprint about 3 mm deep.
Does a screed machine replace the poker vibrator?
No. A vibrating screed compacts only the top 75 to 100 mm. A slab of 125 mm or more, and every beam, still needs a poker vibrator first. Use the poker for depth, the screed for level and surface. Skipping the poker leaves voids around the bottom bars.
What blade length screed do I need?
Choose a blade about 0.5 to 1 metre longer than the bay between your screed rails or forms. For house slabs poured in 3 to 4 metre bays, a 4 or 5 metre blade is right. Warehouse floors in wider bays need 6 metres or a truss screed.
Is screeding a floor a big job?
With a machine, no. Two operators with a vibrating screed can level 80 to 150 square metres an hour on a well prepared slab. By hand with a straight edge, the same crew manages perhaps a third of that, and the flatness is worse.